          In recent years, during the reconstruction of the gas station, the problem of installing finished manhole Wells in old oil tanks was encountered. The composite manhole well flange developed by Youjet company provides a solution for installing finished manhole Wells in old oil tanks. The product is shown as follows:


      image.png


      Figure 1 composite manhole well flange base


      Ⅰ. product features:

          Youjiete composite water stop plate flange (Strengthened inward-flanged manhole well (1400)) is made of high strength SMC single-die molding, which has the following advantages:

      1. Good size consistency, no deformation and good interchangeability;

      2. SMC molding once molding high strength, beautiful appearance;

      3. Good product stability, high degree of automation and easy mass production;

      4. Good matching with oil tank and easy construction of multiple baselines;

      5. Installation operation can be carried out for oil tanks of different diameters.

      Ⅱ. Product size:

      Overall size: Φ1500X443mm

      Net weight: 42kg

      Ⅲ. Product installation instructions:

      1. Lift the flange of composite water stop plate (hereinafter referred to as flange) to the manhole position of the oil tank, align the marking, remove the flange, and polish 150mm inside and outside the marking area with the grinding wheel of Angle grinder louver, then polish the metal oil tank to produce new metal, and then polish the surface of the glass fiber reinforced plastic oil tank.The following schematic diagram and on-site operation photos:


      image.png



      Figure 2 diagram of grinding area


      image.png


      2. Polish the inner and outer areas of the flange with a height of 100mm into pitted surfaces, and polish all the pitted surfaces in the bonding areas as shown below:


      image.png



      Figure 4 shows the gray and white areas


      3. Lift the flange onto the oil tank and install the flange with butt datum line and direction arrow aligned with the oil tank axis, as shown below:


      image.png


      Figure 5 installation diagram


      4. Wipe the adhesive area with a clean cloth or blow the dust with an air gun, and seal the seam with adhesive sealant.


      image.png


      Figure 6 caulking diagram


      5. When the adhesive sealant is solidified, if the flange is bonded to SF steel wall, special resin for iron bonding and glass fiber felt are needed, and the bonding layer is strengthened with the same resin and glass fiber felt as the outer wall of the oil tank, please see the following figure:



      image.png


      Figure 7 construction bonding diagram


      6. After the resin is completely solidified, the flange bonding can be completed. Please see the following figure:

      image.png


      Figure 8 finished effect


      image.png


      Figure 9 site construction drawing


      image.png


      Figure 10 manhole diagram of finished installation


      image.png


      Figure 11 site installation photos

      Last:The construction record of 18 preferred engineering teams of Youjiete
      Next:Eliminate "one-size-fits-all", emissions standards do not need to stop production limit
      News Center

      Contact Us

      Hotline:0086-0318-8625288

      Fax:0086-0318-8625288

      Email:

      Skype:

      Add.:No. 589, Chang’an east road, Jizhou district, Hengshui city, Hebei province,China

      人妻视频二区视频一区,国产精品XXXX在线播放,,亚洲日本va午夜中文字幕一区,国产av福利久久精品can